17
5.3 Starting operation
5.3.1 Starting ClO
2
production
1. MAIN MENU > PROCESS > [OK].
2. START > [OK].
Cancel command:
3. BACK > [OK].
The display returns to the PROCESS submenu.
ClO
2
production is not started.
Execute command:
4. START > [OK].
5. Press [OK].
ClO
2
production starts. The display level appears.
Fig. 10
Display level during operation
Dosing does not have to be started. This is done automatically as
soon as the reservoir tank is filled.
5.4 Interrupting operation
5.4.1 Aborting ClO
2
production
1. Access the MAIN MENU by pressing [OK] in the display level.
2. MAIN MENU > PROCESS > [OK].
3. ABORTION > [OK].
Cancel command:
4. BACK > [OK].
The display returns to the PROCESS submenu.
Abort ClO
2
production:
5. ABORTION > [OK].
6. Press [OK].
The chemical pumps are stopped. To dilute
the undefined
contents of the reactor, it is filled with water up to level 4
afterwards.
5.4.2 Aborting the dosing process
In order to stop the dosing pump, the controller must be switched
off manually.
Switching off the controller in manual operation
1. Press [Man] (manual operation).
2. ClO
2
CONTROLLER > [OK].
3. (Controller) OFF > [OK].
See section
.
PROCESS
START
ABORTION
OPERATION
START
START
BACK
START
START ClO
2
PRODUCTION?
T
M
03
69
05
45
06
.........
24,5 °C
pH 7,35
5
4
3
2
1
0,23 mg/l
PROCESS RUNNING
PROCESS
START
ABORTION
OPERATION
PROCESS
ABORTION
BACK
PROCESS
ABORT ClO
2
PRODUCTION?