background image

English (GB)

11

8. Maintenance

See installation and operating instructions for NK, NKG pumps.

Dosing pump

See the installation and operating instructions for the dosing 
pump. 

Pressure intensifier

The pressure intensifier is maintenance-free.

9. Operation

A very small quantity of the barrier liquid (less than 1.5 ml per 
operating hour) will flow into the pumped liquid.

The flow will increase with:

increasing start/stop frequency

discharge pressure fluctuations

poor shaft seal assembly

worn shaft seal faces.

Dosing pump

The pressure of the barrier fluid must always be at least 1.5 bar 
or 10 % higher than the pressure of the pumped liquid. This is 
automatically checked by the pressure switch/transmitter fitted 
together with the dosing pump.

Pressure intensifier

To ensure optimum function and performance, check that the 
barrier fluid pressure (read pressure gauge pos. 8 in fig. 8) is 
always at least 1.5 bar or 10 % higher than the pressure of the 
pumped liquid (read pressure gauge pos. 9 in fig. 8). As the 
barrier fluid is consumed over time, the pressure intensifier has to 
be refilled.

9.1 Periods of inactivity and frost protection

Pump

For general guidelines, see installation and operating instructions 
for NK, NKG pumps.

Seal chamber

Unscrew the two connections (pos. 2 and 3, fig. 2).

The lower barrier fluid connection functions as drain.

Cartridge seal

1. Unscrew the connections (pos. 1 and 3, fig. 4).

2. Empty the cartridge seal. This can be done in two ways:

Blow out remaining liquid by means of an air gun or a similar 
device. The pressure must not exceed the pressure rating of 
the cartridge seal.

Flush the cartridge seal by means of a glycol-water solution, if 
applicable for the application. The pressure must not exceed 
the pressure rating of the cartridge seal.

Dosing pump

For frost protection, see installation and operating instructions for 
the dosing pump.

10. Service

When ordering spare parts, always state the pump nameplate 
data to ensure that the correct parts are delivered.

If Grundfos is requested to service the pump, Grundfos must be 
contacted with details about the pumped liquid, etc. before the 
pump is returned for service. Otherwise Grundfos can refuse to 
accept the pump for service.

10.1 Service kits and service instructions

See www.grundfos.com (WebCAPS), WinCAPS or Service Kit 
Catalogue.

11. Disposal

This product or parts of it must be disposed of in an 
environmentally sound way:

1. Use the public or private waste collection service.

2. If this is not possible, contact the nearest Grundfos company 

or service workshop.

Warning

Pay attention to the directions of the vent holes,

 

and take care to ensure that the escaping liquid 
does not cause injury to persons or damage to 
the motor or other components. 
When handling hot or hazardous liquids, special 
attention should be paid to the risk of injury 
caused by scalding hot liquid or hazardous 
liquid.
Local safety regulations must be observed.

Subject to alterations.

Summary of Contents for NKG

Page 1: ...GRUNDFOS INSTRUCTIONS NKG Double seal back to back Installation and operating instructions...

Page 2: ......

Page 3: ...taliano IT Istruzioni di installazione e funzionamento 75 Latvie u LV Uzst d anas un ekspluat cijas instrukcija 82 Lietuvi kai LT rengimo ir naudojimo instrukcija 89 Magyar HU Szerel si s zemeltet si...

Page 4: ...Table of contents 4 Svenska SE Monterings och driftsinstruktion 173 T rk e TR Montaj ve kullan m k lavuzu 180...

Page 5: ...the barrier fluid in the barrier fluid chamber 4 Applications The back to back double seal arangement is the optimum solution in these cases The pump is pumping toxic and explosive liquids The pump i...

Page 6: ...rangement with two separate shaft seals in a seal chambe Fig 2 Back to back seal arrangement with two separate shaft seals in a seal chamber In this back to back shaft seal arrangement the seal chambe...

Page 7: ...nt without the cooling effect of recirculation Maximum operating pressure in seal chamber 16 bar Dosing unit outlet 1 x Rp 1 4 Cartridge seal A cartridge seal is not for use with a dead end connection...

Page 8: ...Dimensions apply to all NKG pump sizes TM04 4770 2009 Pos Designation 1 Pressure intensifier 2 Piston 3 Diaphragm 4 Non return valve 5 Relief valve opening pressure 25 bar 6 Vent screw 7 Spring for p...

Page 9: ...fig 2 When the liquid starts running out of the vent hole immediately close the vent screw Cartridge seal Fill the cartridge seal with barrier fluid through one of the connections pos 1 or 3 fig 4 Wh...

Page 10: ...he suction pipe TM04 4465 1309 2 Filling with barrier fluid Fill the intensifier and the seal chamber cartridge seal with barrier fluid and connect the barrier fluid supply pipe to the unused inlet of...

Page 11: ...onnections pos 1 and 3 fig 4 2 Empty the cartridge seal This can be done in two ways Blow out remaining liquid by means of an air gun or a similar device The pressure must not exceed the pressure rati...

Page 12: ...e 81 35 448 1391 Telefax 81 35 448 9619 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRU...

Page 13: ...kes it possible Innovation is the essence The name Grundfos the Grundfos logo and the payoff Be Think Innovate are registrated trademarks owned by Grundfos Management A S or Grundfos A S Denmark All r...

Reviews: