7. Apply Loctite 243 to the threads of the set screws.
Tighten the set screws to the correct torque. See
below.
• M5: 6 ± 2 Nm
• M6: 8 ± 2 Nm
• M8: 15 ± 3 Nm
TM033918
8. Fit the coupling guard. Tighten the screws to the
correct torque. See below.
• M5 x 10 mm: 6 ± 2 Nm
TM033919
4.2 Location
CAUTION
Hot or cold surface
Minor or moderate personal injury
‐
When pumping hot or cold liquids,
make sure that no one can accidentally
come into contact with hot or cold
surfaces.
The pump must be sited in a well-ventilated, but frost-
free location.
4.2.1 Vertical installation, NB, NBG
For inspection and repair, allow suitable
clearances for pump or motor removal.
•
Pumps fitted with motors up to and including 4 kW
require a 0.3 m clearance above the motor.
•
Pumps fitted with motors of 5.5 kW and up require
at least a 1 m clearance above the motor to allow
the use of lifting equipment.
A
TM034128
Clearance above the motor
Motor
Minimum clearance, A
0.25 - 4 kW
0.3 m
5.5 - 37 kW
1 m
18
English (GB)
Summary of Contents for NB 80-200/222VAXEF1BESBQQEWX2
Page 2: ......