Warning
Risk of injury caused by squirting oil!
Oil may squirt from the oil deaeration when the pump is
running. Do not completely unscrew the oil deaeration
screw.
Wear protective clothing (gloves and goggles) when work-
ing on the dosing head, connections or lines!
Note
Rod length of oil dipstick: 27 mm.
Immersion depth to marking: approx. 5 mm.
Note
Check the oil level at least every two weeks and add oil, if
necessary.
Only use original Grundfos gear oil!
For product numbers, see "Service kit catalogue" on
www.grundfos.com
Pump model
Version
Description
DMH 251
Single/double
1,3 l white oil
(Paraffin 55 DAB7)
DMH 252, 10 bar
Single/double
1,3 l white oil
(Paraffin 55 DAB7)
DMH 252, 16 bar
Single/double
1,3 l DHG 68
DMH 253
Single/double
1,3 l DHG 68
After start-up
Caution
After initial start-up and after each time the diaphragm is
changed, tighten the dosing head screws.
After approximately 6-10 operating hours or two days,
cross-tighten the dosing head screws using a torque
wrench.
Torques
Pump model
Torque
[Nm]
DMH 251, 10 bar
8-10
DMH 251, 16 bar
10-12
DMH 251, 25 bar
13-15
DMH 252
8-10
DMH 253
10-12
Related information
6.1 General information on installation
8.3 Start-up/subsequent start-up of DMH 254, 255 and
257
L
F
1l
2
M
M
1q
3b
TM036463
Start-up of DMH 254, 255 and 257
Pos.
Components
1q
Dosing head screws
2
Dosing head
3b
Discharge valve
F
Oil-filling screw with dipstick
L
Stroke-length adjustment knob
1l
Cover for stroke-length adjustment knob
M
Pressure relief valve
1. Connect the electrical power supply.
2. Depending on the installation, start the pump, where possible,
without counter-pressure.
See installation example for easy deaeration of the dosing head
in section Installation.
3. Set the stroke-length adjustment knob (L) to 0 %.
4. Let the pump run for approx. 5 minutes.
5. Check the oil level.
• Set the stroke-length adjustment knob (L) to 40 %.
• Let the pump run for approx. 10 minutes with a stroke-length
setting of 40 %.
• Switch off the pump, check the oil level and add oil, if
necessary.
• Refit the oil-filling screw (F).
The pump is now ready for operation.
Warning
Risk of injury caused by squirting oil!
Oil may squirt from the oil deaeration when the pump is
running. Do not completely unscrew the oil deaeration
screw.
Wear protective clothing (gloves and goggles) when work-
ing on the dosing head, connections or lines!
Note
Rod length of oil dipstick: 35 mm.
Immersion depth to marking: approx. 5 mm.
Note
Check the oil level at least every two weeks and add oil, if
necessary.
Only use original Grundfos gear oil!
For product numbers, see "Service kit catalogue" on
www.grundfos.com
Pump model
Version
Description
DMH 254
Single
3,5 l DHG 68
DMH 254
Double
4,5 l DHG 68
DMH 255
Single
3,5 l DHG 68
DMH 255
Double
4,5 l DHG 68
DMH 257
Single
5,5 l DHG 68
DMH 257
Double
7,5 l DHG 68
31
English (GB)