En
gl
is
h (
G
B)
6
4. Electrical installation
Check that the supply voltage and frequency
correspond to the values stated on the nameplate.
5. Startup
6. Alarms
6.1 Anti-cycling
Enabling and disabling the function
1. Press [Reset] for 3 seconds until "Power on"
starts flashing.
2. Select whether the function should be enabled or
disabled. Each time [Reset] is pressed, the unit
will change between enabled and disabled.
"Pump on" is off when the function is disabled.
"Pump on" is on when the function is enabled.
3. Press [Reset] for 3 seconds to return to
operation.
Warning
The electrical installation should be
carried out by an authorised person in
accordance with local regulations.
Warning
Before making any connections in the
unit, make sure that the power supply
has been switched off and that it
cannot be accidentally switched on.
The unit must be connected to an
external mains switch with a contact
gap of at least 3 mm in all poles.
As a precaution, the unit must be
connected to a socket with earth
connection.
We recommend to fit the permanent
installation with an earth leakage
circuit breaker (ELCB) with a tripping
current < 30 mA.
Caution
Do not start the pump until it has been
filled with liquid.
Caution
If a dry-running alarm has been
activated, find the cause before the
pump is restarted in order to prevent
damage to the pump.
Note
In case of a very small consumption,
the anti-cycling function may detect
this as cycling and stop the pump
inadvertently. If this occurs, the
function can be disabled.
Summary of Contents for CMB-SP PM1
Page 1: ...CMB CMB SP Booster PM1 Supplement to Quick Guide GRUNDFOS INSTRUCTIONS...
Page 2: ...2...
Page 10: ...BG 10 BG 1 2 3 1 10 2 10 3 10 4 11 5 11 6 11 6 1 11 7 12 8 14 DIN 4844 W00 CM Booster...
Page 11: ...BG 11 4 5 6 6 1 1 Reset 3 Power on 2 Reset Pump on Pump on 3 Reset 3 3 mm ELCB 30 mA...
Page 13: ...BG 13 6 Alarm a b PM c d e PM PM 7 Alarm a 8 a b c d 9 a b c 10 a 11 a b 12 a...
Page 14: ...BG 14 8 1 2 Grundfos 13 a b c d 14 a b c 15 a 16 a b 17 a...
Page 35: ...GR 35 GR 1 2 3 1 35 2 35 3 35 4 36 5 36 6 36 6 1 36 7 37 8 39 CM CM...
Page 36: ...GR 36 4 5 6 6 1 1 Reset 3 Power on 2 Reset Pump on Pump on 3 Reset 3 3 mm ELCB 30 mA...
Page 37: ...GR 37 7 1 Power on a b c d 2 Pump on a b c d 3 Pump on a b 4 a b c 1 5 a b c d...
Page 38: ...GR 38 6 Alarm a b c d e 7 Alarm a 8 a b c d 9 a b c 10 a 11 a b 12 a...
Page 39: ...GR 39 8 1 2 Grundfos 13 a b c d 14 a b c 15 a 16 a b 17 a...
Page 80: ...UA 80 UA 1 2 3 1 80 2 80 3 80 4 81 5 81 6 81 6 1 81 7 82 8 84 CM Booster CM Booster...
Page 81: ...UA 81 4 5 6 6 1 1 Reset 3 Power on 2 Reset Pump on Pump on 3 Reset 3 3 ELCB 30...
Page 83: ...UA 83 6 Alarm a b PM c d e PM PM 7 Alarm a 8 a b c d 9 a b c 10 a 11 a b 12 a...
Page 84: ...UA 84 8 1 2 Grundfos 13 a b c d 14 a b c 15 a 16 a b 17 a...
Page 96: ...RU 96 4 5 6 6 1 1 Reset 3 Power on 2 Reset Pump on Pump on 3 Reset 3 3 30...
Page 98: ...RU 98 6 a b PM c d e PM 7 Alarm a 8 a b c d 9 a b c 10 a 11 a b 12 a...
Page 99: ...RU 99 13 a b c d 14 a b c 15 a 16 a b 17 a...
Page 140: ...140...
Page 141: ...141...