GRUNDFOS
INSTRUCTIONS
www.grundfos.co.uk
Page 3 of 35
1.0 When and how to use the FireSAFE Installation & Operating manual
Prior to
Installation, Commissioning
and
System verification
of this product, the
installer should fully read this Installation and Operating manual.
The Installation and operation must also comply with local regulations and accepted
codes of good practice.
Use the Installation checklist, when installing the product, Section 9.4
Use the Commissioning checklist, when installing the product, Section 9.5
Use the System verification checklist, when installing the product, Section 9.6
Prior to
Operation
of this product, the user should fully read this Installation and
Operating manual fully. The user is responsible for periodic inspection of the product, at
a recommended interval of every 6 months.
Use the User inspection checklists, Section 11.1
Prior to
Fault finding
on this product, read this Installation and Operating manual fully.
Use the Fault finding checklists, Section 17.0
Prior to
Servicing and the annual
test
on this product, read this Installation and
Operating manual fully.
Use the Service and annual test checklist, Section 13.1
The use of this product requires experience with and knowledge of the product.
Persons with reduced physical, sensory or mental capabilities must not use this
product, unless they are under supervision or have been instructed in the use of the
product by a person responsible for their safety.
A product
History log
is included for the installer to complete and the user to retain.
All activities relating to installation, commissioning, system verification, service, annual test and
any other maintenance performed on the product should be logged.
For quick reference the front page of this Installation and Operating manual should be filled in
with the contact details of the Installer or building supervisor. This manual should stay with the
FireSAFE
unit.