Installation
15 | 40
B
A
_
T
D3
-A
F
0
0
1
e
n
_
0
0
4
_
F
e
inf
ilte
r-
F
M
.d
o
cx
Parallel piping
Parallel piping of 2 GENO-fine filters for the filtration of process, boiler feed, cooling and air
conditioning water in order to ensure an uninterrupted operation even during the
replacement of filter elements.
Item
Designation
Item
Designation
1
Inlet shut-off valve
2
Outlet shut-off valve
4.2
Requirements regarding the installation site
Observe local installation directives, general guidelines and technical specifications.
● The installation site must be frost-proof and ensure the filter's protection from
chemicals, dyes, solvents, vapours and direct sunlight.
● The installation room must provide an adequately dimensioned floor drain. If no
floor drain is available, an appropriate safety device must be installed in order to
prevent water damage. We recommend using a protectliQ:A.
● The installation site must be easily accessible for maintenance purposes.
Summary of Contents for GENO-fine FM 150
Page 1: ...We understand water Filters GENO fine filter FM Operation manual...
Page 34: ...Operation log 34 40 BA_TD3 AF001en_004_Feinfilter FM docx Date Work performed Signature...
Page 35: ...Operation log 35 40 BA_TD3 AF001en_004_Feinfilter FM docx Date Work performed Signature...
Page 36: ...Operation log 36 40 BA_TD3 AF001en_004_Feinfilter FM docx Date Work performed Signature...
Page 37: ...Notes 37 40 Notes...
Page 39: ......