Operation log
59 | 68
B
A
_
TD
3
-CK0
0
0
e
n
_
0
2
4
_
e
x
a
liQ.
d
o
cx
1st maintenance
Operating values
Dosing volume test carried out by Grünbeck mySettings app (result:
yes
no
Dosing history read-out/documented (USB interface)
yes
no
Mineral-based solution replacement container available
yes
no
Mineral-based solution shelf life
Date to:
Water pressure, flow pressure
[bar]
[bar]
Residential water meter reading with/without garden pipe
[m³]
Read out error memory
Error
Date
Time
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Maintenance work
OK
Hose connections checked for leaks and damage
Whole of dosing system checked for leaks and damage
Power supply unit/power cables checked for damage and firm seating
Water meter checked for pulse output
Dosing valve checked for leaks and damage
Wearing parts: Pump, eccentric, driven gear, dosing valve checked for wear
(see technical service manual for exaliQ dosing system)
Remarks
Performed by
Company:
Service technician:
Date
Signature