Installation
14 | 28
BA
-T
D3
-A
K
0
0
1
e
n
_
0
0
5
_
B
OX
E
R_K
X
-K
DX
4.3 Installing the product
4.3.1 Installing connection flange
The connection flange can be mounted in a horizontal or vertical
water pipe.
1.
Install the water meter screw connection into the pipe.
2.
Position the connection flange
–
Observe flow direction
.
3.
Tighten the connection flange using a combination wrench
at the union nuts without applying tension.
»
The connection flange is installed.