background image

Growatt ShineLimit

User manual

For more info, please download from http://server.growatt.com

+86 755 2951 5888

+86 755 2747 2131

[email protected] 

www.ginverter.com 

1) Before using the unit, please read this manual carefully. 

     Otherwise, if you don’t follow the steps described of the 

     instruction to use and cause any damaged,Growatt has the 

     right not to service you.

2) All the tasks described in this manual should be performed by 

    qualified personnel.

3) During installation, please don’t touch any inside part of this 

    unit besides terminals.

4) All wires connection of unit should be abided by the local 

    electric safety criterions.

5) If necessary, please contact specified installer

Item

Name

Description

A

PV panel

Inverter PV panel

B

Inverter

PV Inverter with ShineRFStick

C

Loads

User loads

D

SP-CT

ShineLimit  detecting meter

E

Grid 

220V public grid

F

ShineLanBox

ShineLimit  controller

G

Router

Unpacking

1.1 Unpacking ShineLink, and check the package 

      device list:

·

Safety precaution

·

Product Description

Growatt ShineLimit0 is the zero output control system for 

pv plant. It use RF wireless devices to communicate, like 

ShineRFStick and SP-CT, control the pv inverter active power 

by the power of loads to enable zero output to Grid, and can be 

monitored from the net server by RJ45. The System Diagram 

as bellow:

System Diagram:

Step1.

Item

Name

Quantity

A

ShineLanBox

1

B

ShineRFStick

1

C

Network

1

D

Power adapter

1

E

Fixing screws

4

F

Wall plastic posts

2

G

User manual

1

1.2 Unpacking SP-CT, and check the package device 

  

list:

Item

  A

  B

  C

  D

  E

  F

 

--

 --

Description

Growatt SP-CT

Antenna

Sensor (water-proof terminal)

M5*30 pan head screw

Expansion screw

W

 

Sucker antenna this is for SP

(Storage machine)

arranty card

Manual

Quantity

      1

      1

      1

      2

 

      2

      

      

      1

      1

1

1.3 SP-CT SE

1.3.1 Nameplate description

There is some essential information such as product model, 

specifications and approva

l on the Nameplate in the 

rear of SP-CT:

Installation

Step2.

2.1 General precautions

A. Safety measures

·

Qualified personnel can operate only

·

The kids, the disable, non-professional are 

not allowed to close.

SP-CT High voltage danger

SP-CT Ground wire connection

Ensure  the  SP-CT  ground  wire  is  properly 
earthed 

Symbol

Description

Risk of electric shock!

Ground point

Alternating current

CE Mark, which means it satisfies CE criterion

RCM Mark, which means it satisfies RCM criterion.

B. Symbol used of SP-CT

C

.

Device install place please refer to the system Diagram 

      above.About the distance between the ShineLanBox with the 

      ShineRFStick and SP-CT, the maximum linear distance is 

      200m if there is no obstructions between then; the maximum 

     distance is 50m if there is one wall between then; 

     the maximum distance is 20m if there are two walls between 

     then.

2.2 Install SP-CT

2.2.1 Basic requirements of mounting

time. ( refer to the chapter 3.3 to know the precise weight) 
B Mount on where has enough space for SP-CT ( refer to the chapter 3.3)

.

C Do not mount on flammable construction materials 

.

D Designed with IP65 degree for indoor or outdoor applications .
E Ambient humidity range: 0~95%

.

F Ambient temperature range: -25

℃~

60 

.

G Vertically installation or tilt angle 15-dgress installation is ok, as the 

chart 5.1 

.

Mount on solid surface and can accommodate weight of SP-CT long 

.

H

 To make sure operate and maintain available the unit, please leave 

enough space for SP-CT.

2.3 Installation guide

2.3  Installation layout

.1

2.3  Mounting

.2

1). Mark locations of the hole of SP-CT.

2). Insert 2 expansion screws in the holes.

3). Screw 2 screws( M5) firmly.

4). Place the SP-CT on the 2 screws .

Installation layout of storage energy system with SP-CT should 

be as following feature shows . 

Note: The recommend distance between stored-energy machine 

    

and SP-CT is less  than 50 m.

I

  function .

 Do not install where is near to Radio or machine which has wireless 

J Do not install the place where the children can reach.

2.4 Wires connection

2.4  AC auxiliary power wires connection

.1

Preparation:

(1) Ensure the grid voltage is 230VAC or 240VAC, frequency 

      is 50/60Hz single phase.

(2) Connection mode:

a) Type I:Connect the AC terminal of SP-CT to the AC breaker 

                 of power distribution cabinet.

b) Type II:Press the AC terminal (British standard) of SP-CT 

                  on the nearby socket. Because of installation outside,

                  the  socket should be water-proof.

Caution:Ensure the utility phase of SP-CT position is same 

with stored-energy machine and PV inverter phase position.

Type I

Typ II

Note: Type II installation is mainly suitable for British 

           standard area.

Green indicator solid on

Green indicator flash

Red indicator solid on

Working normal

In pair status

Fault e.g L  and N connected

reversely or GND wire unconnected

Reviews: