Quick Installation Manual

Installation environment

Installation tools

Max

.+

50

Min

.-

10

RH

.+

5

%~+

95

%

1.Check

ARK-2.5L-A1 

ARK-2.5L-A1 Parallel Cable

 

ARK-2.5L-A1 Base 

Installation Method

Compound Mode

Standard Wall-Mounted Installation

Wall-Mounted Battery system stacked in two line

Floor installation battery system stacked in two line

A+B

A+B+D

A+B+C

A+B+C+D*2

System size

 2.Floor installation with base

Installation Location Requirements

2-1

Note

:  

 Installation Procedure

Note

: The number of wall-mount installations should not exceed four.Please make sure that the weight capacity 

          of wall should exceed 150kg.

Installation Location Requirements

3. Wall-Mounted Installation Process

Check Packing List

1-1

Check accessories

1- 2

2-2

3-1

The safety part needs to be installed at the top battery, however, once the number of the battery pack is 
higher than 7, one more safety part should be installed in the middle battery which is shown the last step. 
Avoid drilling holes in the water pipes and cables buried in the wall.