background image

ARK 2.5H-A1

Quick Installation Manual

Installation environment

Max

.+

50

Min

.-

10

RH

.+

5

%~+

95

%

Installation tools

System size

1.Check

Check ARK 2.5H-A1 List

1-2

ARK 2.5H-A1

 X1 

Serial cable 

X1 

Check HVC60050-A1 List

1- 1

HVC60050-A1 X1 

Warranty card X1

Quick installation Manual X1 

Power cable ( to battery) X1 

Plug X1 

Diagram of wiring connection 

5-3

Note:

 

1

Before installing the system, ensure that the voltage difference of the battery pack is less than 0.5V

2

For the same system, it is recommended to select the battery with the manufacturing date difference within 3 months, 

otherwise the system capacity will be limited.
3

If there is a switch between PCS and battery,  it is recommended to use a circuit breaker with rated voltage greater than 

750V and rated current greater than 63A.

To PCS

Insert Plug

To PCS

Insert Plug

ARK 2.5H-A1 Series cable

ARK 2.5H-A1 cable

Battery-

CAN

PE

CAN Battery- 

PE

6.Terminal Connection

Power terminal  

6-1

Communication terminal 

6-2

1

8.Service and contact

Shenzhen Growatt New Energy Co., Ltd

     86 0755 2747 1942

Growatt New Energy

6

5

 HVC60050-A1

ARK 2.5H-A1

 Power ON battery system

Power OFF battery system

a

Power on battery system

Turn the circuit breaker to the "on" state, 
then press the "POWER" button for 5-6 seconds, 
and wait until the LED of the battery system lights up, 
indicating that the power on is completed

7.Battery system switch operation

ARK 2.5H-A1 Connection end face introduction 

5-2

1

2

3

4

5

6

7

Wire side

Wire side

b

Power off battery system:

Turn the circuit breaker to "off" to turn off the 
entire battery system

4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave, Bao'an District, Shenzhen, China

1

Communication input

5

Ground terminal

2

Communication output

6

Pressure relief valve

3

Module negative 
terminal

7

Ground terminal

4

Module positive 
terminal

Reviews: