-20-
Model G0750GV (Mfd. Since 03/18)
Assembly
IMPORTANT: During the following steps, DO
NOT attempt to lift or move this lathe without
using the proper lifting equipment (such as a
forklift or crane) or the necessary assistance
from other people. Each piece of lifting equip-
ment must be rated for at least 2000 lbs. to
support dynamic loads that may be applied
while lifting.
4. Remove shipping crate, then remove small
components from shipping pallet.
5. Move lathe to its prepared location while it is
still attached to shipping pallet.
6. Unbolt lathe from shipping pallet.
7. Attach handles to handwheels with shoulder
screws, as shown in
Figure 15.
This machine and its parts
are heavy! Serious personal
injury may occur if safe
moving methods are not
used during the following
steps. To reduce the risk of
a lifting or dropping injury,
ask others for help, and use
powered lifting equipment.
To assemble lathe:
1. Position left and right cabinets approximately
34" apart in prepared location (see
Figure 13).
2. Attach front panel brackets to cabinets with
(4) M6-1 x 10 Phillips head screws and (4)
6mm flat washers (see
Figure 13).
3. Attach front panel to panel brackets with
(4) M6-1 x 10 Phillips head screws, (4) 6mm
flat washers, and (4) M6-1 hex nuts (see
Figure 14).
Figure 15. Handles attached to handwheels.
Handles
The machine must be fully assembled before it
can be operated. Before beginning the assembly
process, refer to
Needed for Setup and gather
all listed items. To ensure the assembly process
goes smoothly, first clean any parts that are cov-
ered or coated in heavy-duty rust preventative (if
applicable).
Figure 14. Front panel attached.
Front Panel
x 4
Figure 13. Brackets attached (rear view).
x 4
Brackets
34"
Summary of Contents for G0750GV
Page 116: ......