Model G0750GV (Mfd. Since 03/18)
-15-
SECTION 3: SETUP
This machine was carefully packaged for safe
transport. When unpacking, separate all enclosed
items from packaging materials and inspect them
for shipping damage.
If items are damaged,
please call us immediately at (570) 546-9663.
IMPORTANT: Save all packaging materials until
you are completely satisfied with the machine and
have resolved any issues between Grizzly or the
shipping agent. You MUST have the original pack-
aging to file a freight claim. It is also extremely
helpful if you need to return your machine later.
Unpacking
The list below outlines the basic process of pre-
paring your machine for operation. Specific steps
are covered later in this section.
The typical preparation process is as follows:
1. Unpack the lathe and inventory the contents
of the box/crate.
2. Clean the lathe and its components.
3. Identify an acceptable location for the lathe
and move it to that location.
4. Level the lathe and bolt it to the floor.
5. Assemble the loose components and make
any necessary adjustments or inspections to
ensure the lathe is ready for operation.
6. Check lathe for proper lubrication.
7. Connect the lathe to the power source.
8. Test run lathe to ensure it functions properly.
9. Perform the spindle break-in procedure to
prepare the lathe for operation.
Preparation
The following are needed to complete the setup
process, but are not included with your machine.
•
For Lifting and Moving:
— A forklift with extension forks, or other
power lifting device rated for at least 2000
lbs.
— Two lifting straps rated for at least 2000 lbs.
each
— A lifting safety hook rated for at least 2000
lbs.
— Another person for moving machine
— Tube of silicone sealant
•
For Power Connection:
— A power source that meets the minimum cir-
cuit requirements for this machine (review
Power Supply on Page 13 for details)
— An electrician or qualified service person-
nel to ensure a safe and code-compliant
connection to the power source
•
For Assembly:
— Shop rags
— Cleaner/degreaser (see
Page 18)
— Quality metal protectant lubricant
— Safety glasses for each person
— Floor mounting hardware as needed (see
Page 22)
— Precision level at least 12" long
Needed for Setup