The unit can operate with voltage
360÷460 Vac
three phase with neutral
(GR0700)
or with voltage
187÷230 Vac
three phase with neutral
(GR0701)
and with frequency of
50/60Hz
.
Connect the projector to the ballast unit.
Connect the cable
“25”
into the socket
“26”
.
Connect the plug
“27”
with the socket
“28”
using the
cable for the electronic strobe supplied together with the
unit.
Connect the socket (3P+N+G) supplied with the unit, to a
cable with a minimum section of 2.5 mm² (3x2.5 + N +G).
8.0 Connection to mains power
Phase 3
Neutral
Ground
Phase 2
Phase 1
R1
S2 T3
N
N
T3
S2
R1
R1 = Phase 1
S2 = Phase 2
T3 = Phase 3
N = Neutral
= Ground
25
26
27
28
Warning!
• Before connecting the unit, verify that power supplies features are compatible with the unit features.
• The unit must never be installed if not grounded electrically.
• It is suggested to use a magnetothermic switch along the power supply line, as prescribed by in force rules.
• The unit must not be powered up through a dimmer power device.
• Wiring and connection actions are to be performed by a qualified staff.
English
39