background image

Quick Start Guide 

Industrial 5-Port 10/100Mbps Management 

Ethernet Switch   

MODEL GC-ATC-405 

 

 

 

 

 

 

 

Note: These instructions are for a typical installation.   

Refer to the long form installation and management 

guides found from CD details. 

1.

The GC-ATC-405 is shipped with the following 

items.   

If any of these items is missing or damaged, please 

contact your customer service representative for 

assistance. 

    

  GC-ATC-405 Ethernet Switch.                  1Pcs 

  Quick Start Guide                                        1Pcs 

  CD-ROM with User’s Manual and Windows   

Utility.

                                                           

1Pcs 

  Panel Mounting Kit.                                    1Pcs 

 

2. Install the switch to your DIN rail as shown in the 

diagram below. First, hook the top of the DIN rail clip 

to the rail. Then push the bottom of the switch 

towards the rail until it locks into place. Refer to the 

Hardware Installation Guide.   

 

 

   

 

 

 

 

 

3. Apply power to the switch per the instructions 

following the warnings below.   

The  switch  will  have  a  removable  screw  terminal 

plug  (green)  as  shown  in  the  diagram.  The  function 

of each position will be indicated on a label adjacent 

to the plug and/or on the side of the switch. 

 

 

 

 

 

Step 1: Insert the negative/positive DC wires into the 

V-/V+ terminals. 

Step 2: To keep the DC wires from pulling loose, 

use a small flat-blade screwdriver to tighten the 

wire-clamp screws on the front of the terminal block 

connector. 

STEP 3: Insert the plastic terminal block connector 

prongs into the terminal block receptor, which is 

located on the EDS’s bottom panel. 

STEP 4: Turn on your source power and verify that 

the power LED(s) are on. 

4. Plug in your Ethernet cables and the switch will 

immediately start to operate and pass data.   

5. Now you may configure the switch for more 

advanced operations. See below for further 

information.   

Unmanaged Switches (GC-ATC-405U): No 

configuration is available or necessary. 

Managed Switches (GC-ATC-405):   

To set the IP address so that you can manage the 

switch via the web interface:   

A. Connect the switch directly to your PC’s Ethernet 

port using any Ethernet patch cable. The switch’s 

default IP is 192.168.2.1

B. On your PC, go to Control Panel – Network 

Connections and access the properties for your 

LAN’s Internet Protocol (TCP/IP). Record your 

current settings, then select “Use this IP address” 

All power, input and output (I/O) wiring must be in 
accordance with Class I, Division 2 wiring methods   
and in accordance with the authority having 
jurisdiction. 

 

WARNING – EXPLOSION HAZARD – SUBSTITUTION OF 
COMPONENTS MAY IMPAIR SUITABILITY FOR CLASS I,   
DIVISION 2.   
WARNING – EXPLOSION HAZARD – WHEN IN HAZARD 
OUS LOCATIONS, DISCONNECT POWER BEFORE   
REPLACING OR WIRING UNITS.   
WARNING – EXPLOSION HAZARD – DO NOT 
DISCONNECT 
EQUIPMENT UNLESS POWER HAS BEEN SWITCHED OFF 
OR THE AREA IS KNOWN TO BE NONHAZARDOUS.   
WARNING – EXPLOSION HAZARD – IN HAZARDOUS OR   
POTENTIALLY HAZARDOUS LOCATIONS, DO NOT   
SEPARATE ANY PART OF THE UNIT WHEN ENERGIZED.   
USE THE UNIT FOR INTERNAL CONNECTIONS ONLY.   

Reviews: