28 Foot DX Flagpole Antenna
Assembly Guide
Greyline Performance
Holladay, Utah USA
[email protected]
Phone 435-200-4902
Page 1: ...28 Foot DX Flagpole Antenna Assembly Guide Greyline Performance Holladay Utah USA flagpoleantennas gmail com Phone 435 200 4902 ...
Page 2: ...ithin 1 of top of ground sleeve IMPORTANT Keep concrete out of ground sleeve d Insert a pole section into the ground sleeve and use a level to make sure that the pole is completely vertical before concrete cures e Remove pole section and let concrete set at least 24 hours before proceeding with installation 2 Locate ASSEMBLY 1 Locate ASSEMBLY 1 and insert Feed Line As shown in diagram Then set it ...
Page 3: ...nd 3 4 Assemble All Remaining Sections a Insert ASSEMBLY 3 into ASSEMBLY 4 as shown b In the same manner Assemble all remaining sections 5 Final Assembly a Using two people lift mast and place into PVC Sleeve in ground b If desired a Cleat for tying Flag rope can be installed into holes which have been pre drilled in ASSEMBLY 2 ...
Page 4: ...ASSEMBLY INSTRUCTIONS Greyline Performance Holladay Utah USA flagpoleantennas gmail comPhone 435 200 4902 ...