12/16/20/24 Foot DX Flagpole Antenna
Assembly Guide
Greyline Performance
Holladay, Utah USA
[email protected]
Phone 435-200-4902
Page 1: ...12 16 20 24 Foot DX Flagpole Antenna Assembly Guide Greyline Performance Holladay Utah USA flagpoleantennas gmail com Phone 435 200 4902 ...
Page 2: ...RTANT Keep concrete out of interior of ground sleeve c Insert a pole section into the ground sleeve and use a level to make sure that the pole is completely vertical before concrete cures d Remove pole section and let concrete set at least 24 48 hours before proceeding with installation 2 Install Feed through Lower Fiberglass Insulator a Locate ASSEMBLY 1 and insert Feed Line as shown in diagram T...
Page 3: ...manner b Attach Assembly3 to Assembly 4 5 6 in a similar manner c NOTE Depending on which model you have purchased you may need to repeat step b above up to three times d Attach Top Section e Using two people lift mast and place into PVC Sleeve in ground f If desired a Cleat for tying Flag rope can be installed into Assembly 3 ...
Page 4: ...ASSEMBLY INSTRUCTIONS Greyline Performance Holladay Utah USA flagpoleantennas gmail com Phone 435 200 4902 ...