background image

IOM APEX Curb FS

Rev. 1, February 2003

STEP 6: Final Assembly

Hardware Required:         (6)

3

8

-16 x 

3

4

Serrated Flange Bolts

(6)

3

8

-16 x 

3

4

Serrated Flange Nuts

(1)

Center Channel

(1)

Exhaust Center and End Base Assembly (See Step 5)

(1)

Supply End Section (See Step 3)

Instructions:

• Position Channels as shown in 

Figure 8

.

• Align the holes and fasten as illustrated below.

Figure 8: 

Final Assembly

Curb Dimensions

7

283.50

92.00

GREENHECK

   

P.O. BOX 410  SCHOFIELD, WISCONSIN 54476-0410

PH. 715-359-6171

www.greenheck.com

Reviews: