IOM APEX Curb FS
Rev. 1, February 2003
STEP 6: Final Assembly
Hardware Required: (6)
3
⁄
8
-16 x
3
⁄
4
Serrated Flange Bolts
(6)
3
⁄
8
-16 x
3
⁄
4
Serrated Flange Nuts
(1)
Center Channel
(1)
Exhaust Center and End Base Assembly (See Step 5)
(1)
Supply End Section (See Step 3)
Instructions:
• Position Channels as shown in
Figure 8
.
• Align the holes and fasten as illustrated below.
Figure 8:
Final Assembly
Curb Dimensions
7
283.50
92.00
GREENHECK
P.O. BOX 410 SCHOFIELD, WISCONSIN 54476-0410
PH. 715-359-6171
www.greenheck.com