GREEN LOO
DRY COMPOSTING TOILET
Owners
–
Installation
Operation
Manual
for the
ROTA-POD
Page 1: ...GREEN LOO DRY COMPOSTING TOILET Owners Installation Operation Manual for the ROTA POD...
Page 2: ...nal Rota Pod Instruction leaflet supplied Please note that the original instruction the Finnish manufacturer has supplied are enclosed with the Rota Pod There are some dissimilarities with the Green L...
Page 3: ...ools and materials available at plumbing suppliers or hardware shops Installation of the Rota Pod involves 1 Preparing a flat level and firm base for the composting container to sit 2 Installing the v...
Page 4: ...ent piping or providing a moisture condensate trap as per page 4 and 5 Excess Liquid A lot of the liquid waste is used up in the composting process as well as being evaporated through the vent system...
Page 5: ...wall of the toilet to allow the excess liquids drain hose to traverse Attach the hose to the Rota Pod using the supplied hose clamp and feed through wall Seal hole with silicone Connect the hose to th...
Page 6: ...e cap This is your moisture trap which should be emptied every few weeks by undoing the cap letting the water drain out and re attaching the cap b If using a 45 degree joiner supplied as standard atta...
Page 7: ...ing in the Rota Pod 3 months is ideal or external composter When emptying a container carry to the disposal site Gently lay the container on its side and start emptying the container with a spade shov...
Page 8: ...sitate to contact us with any questions suggestions we are here to help Feedback is always welcome and is an invaluable part of providing an excellent product and service Finally thank you for being a...