Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION
44
Note: when the distance between outdoor units exceeds 2m (6-1/2 feet), U-type oil trap should be
added at low-pressure gas pipe. a
≤
10m (32-7/8 feet); b
≤
10m (32-7/8 feet).
5 SIZE REQUIRMENT FOR FITTING PIPE AND BRANCH
(1) Connection sketch map of single-module system
(2) Connection sketch map of multi-module system
Summary of Contents for Ultra Heat GMV-VQ72W/A-F
Page 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Recovery Series ...
Page 30: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 26 ...
Page 73: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 69 ...
Page 135: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 131 ...
Page 203: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 199 5 4 NCHS4B U ...
Page 205: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 201 5 5 NCHS8B U ...
Page 207: ...Jf00303410 ...