Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION
41
PART 5 PIPING CONNECTION
1 SCHEMATIC DIAGRAM OF PIPING CONNECTION
High pressure gas pipe
Liquid pipe
Outdoor
connection pipe
Low pressure gas pipe
Branch between indoor units
Connection pipe between outdoor
branch and the first indoor branch
Connection pipe between indoor branch and indoor units
Mode
exchanger
Mode
exchanger
Mode
exchanger
Indoor
unit 1
Indoor
unit 2
Indoor
unit 3
Indoor
unit 4
Indoor
unit 5
Indoor
unit 6
Connection pipe between mode
exchanger and indoor units
Connection pipe between indoor branchs
Connection pipe between indoor branch and mode exchanger
Connection pipe between mode
exchanger and indoor branch
Connection pipe between indoor branchs
Connection pipe between indoor branchs
Connection pipe between
mode exchanger and indoor units
Connection pipe between indoor branch and indoor units
Module
1
Module 2
Branch between
outdoor units
2 SCHEMATIC DIAGRAM OF PIPING SEQUENCE
GMV-VQ72W/A-F(U), GMV-VQ96W/A-F(U):
Summary of Contents for Ultra Heat GMV-VQ72W/A-F
Page 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Recovery Series ...
Page 30: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 26 ...
Page 73: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 69 ...
Page 135: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 131 ...
Page 203: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 199 5 4 NCHS4B U ...
Page 205: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 201 5 5 NCHS8B U ...
Page 207: ...Jf00303410 ...