Part 4 Requirements on Foundation
Installation
I. ODU Foundation
The concrete foundation of the ODU must be strong enough. Ensure that the drainage is smooth
and that the ground drainage or floor drainage is not affected.
Requirements on the concrete foundation are as follows:
A. The concrete foundation must be flat and have enough rigidity a
nd strength to undertake the unit‘s
weight during running. The height of the foundation is 200 mm to 300 mm, which is determined
based on the size of the unit.
B. The proportion of the cement, sand, and stone for the concrete is 1:2:4. Place 10 reinforced steel
bars (φ10 mm) with a space between of 30 mm.
C. Use the mortar to flatten the surface of the foundation. Sharp edges must be chamfered.
D. When the foundation is built on a concrete floor, crushed stones are not required. But the foundation
surface must be roughened.
E. Clear the oil stains, crushed stones, dirt, and water in the reserved bolt hole of the foundation and
install a temporary cover before installing bolts.
F. Build a drainage ditch around the foundation to discharge the condensate water.
G. If the air conditioner is installed on the roof, check the intensity of the building and take waterproof
measures.
H. If a u-steel foundation is adopted, the structure must be designed with sufficient rigidity and strength.
Anchor bolt with a nominal
diameter of 12 mm
Minimum width: 100 mm
Proportion of the cement, sand, and
stone for the concrete is 1:2:4.
Drain tank: 100 mm×20 mm
This distance is determined based on the actual size of the unit.
Cement foundation diagram
200 mm~300 mm
30 mm
Summary of Contents for GMV-224WM/B-X
Page 1: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL T1 R410A 50 60Hz GC201508...
Page 27: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 24...
Page 29: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 26 V Construction Organization Process...
Page 38: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 35...
Page 47: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 44 GMV 504WM B X GMV 560WM B X and GMV 615WM B X...
Page 156: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 153 low press ure air pipe...
Page 158: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 155 2 Low exhaust temperature protection E2...
Page 160: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 157...
Page 161: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 158 5 System refrigerant lacking protection U4...
Page 162: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 159 6 System high pressure ratio protection J8...
Page 163: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 160 7 System low pressure ratio protection J9...
Page 165: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 162 11 Pressure sensor fault...
Page 224: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 221 2 Model GMV 335WM B X Exploded View...
Page 242: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 239...
Page 248: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 245 Click Finish...
Page 254: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 251 Click Next Installing...
Page 255: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 252 Click Close...
Page 272: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 269...
Page 287: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 284 1 4 2 5 Communication Debug...
Page 297: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 294...
Page 304: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 301...
Page 307: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 304...
Page 349: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 346...
Page 375: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 372 JF00302751...