2019-03-19
411-198M
YP4025A-48TR20
Operating Instructions
64
Field Operation
and “
First Pass Operation Checklist
Page
1.
Set tractor 3-point hitch to “depth control”
operation (and not load control)
-
2.
Unfold marker on next-row side.
3.
Set fan hydraulic circuit to low flow, engage
circuit. Gradually adjust fan hydraulic flow
to obtain recommended initial fan rpm.
4.
Prime meters with seed.
Leave fan running.
5.
Engage hydraulic seed drive via seed
monitor. Refer to seed monitor manual.
-
6.
If product has a fertilizer system integrated
with the DICKEY-john seed monitor, set the
“Fert.Pump” switch on the Clutch Folding
Module to ON.
7.
In the CLUTCH cluster of the Clutch
Folding Module, set all switches, including
Master, to ON.
8.
Pull forward, lower product, and begin
planting for a short distance.
9.
Stop. Assess:
•
planting depth
•
seed spacing
•
press wheel operation
•
fertilizer application (if in use)
10.
Make necessary adjustments
Sharp Field Turns Checklist
Page
1.
Fold marker
2.
Raise product
3.
Make turn
4.
Lower product
5.
Unfold marker on next-row side.
6.
Resume planting.
Suspending Planting Checklist
Page
1.
Stop tractor
2.
Fan hydraulic circuit to Float or Neutral
3.
Fold Marker
4.
Raise product
Ending Planting Checklist
Page
1.
Suspend operations as above, then
2.
Install lift locks
3.
Set caster locks to ROAD
4.
Fold product
5.
Lights ON
-
6.
Transport
Ending Planting Checklist
Page