![GREAT PLAINS Yield-Pro Air-Pro YP2425A Operator'S Manual Download Page 94](http://html1.mh-extra.com/html/great-plains/yield-pro-air-pro-yp2425a/yield-pro-air-pro-yp2425a_operators-manual_2259528094.webp)
Great Plains
| 401-626M | 2019-06-11
90
YP2425A
Troubleshooting
Seed Pool Recovery
When a meter has been starved of seed, back-flow of air
through the open shutter reduces delivery air flow. This
causes seed delivery to be slow. If you start or resume
planting with an empty seed pool, the delivery flow may
be too low to keep the meter supplied. The steps below
quickly “prime” the meter by rebuilding the seed pool.
Refer to Figure 126 (which depicts a recovery after an
incidence of bridging at air release screen)
1. Close the shutter . This stops the air back-flow.
2. Clear the bridge or blockage that caused the
meter to run empty.
3. With the fan running, listen for seed to fall into the
inlet.
4. Wait for seed fall to taper off and stop.
5. Open the shutter to the operating setting.
6. Start or resume planting.
29744
Figure 126
Seed Pool Recovery
29744
1
2
3
4
5
Summary of Contents for Yield-Pro Air-Pro YP2425A
Page 172: ...Table of Contents Index Table of Contents Index...
Page 178: ...Great Plains 401 626M 2019 06 11 Table of Contents Index 174 YP2425A Table of Contents Index...
Page 179: ...Table of Contents Index Table of Contents Index...
Page 180: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 Table of Contents Index...