3PYPA
Table of Contents
Index
Maintenance and Lubrication
Great Plains
| 401-647M | 2019-06-11
Table of Contents
Index
103
Refer to Figure 128
8. If the planter has Y-tubes, shut off the gates at all of
the Y-tubes.
9. Turn on the air fan and let it run. Use the
“SPLIT AIR -” softkey
a
to reduce the regulated air
pressure to a low value, 1 inch water pressure or
less - this diverts most of the air to the bulk seed
delivery system.
Reduce fan speed as necessary to obtain a low
meter pressurization.
Clean out meters with fan running. Work from one side of
the planter to the other.
Meter Clean-Out
When planting is completed, it is commonly the case that
some seed remains. There may be seed in the hoppers,
hose lines, and meters.
Refer to Figure 129
The planter includes an 817-811C container for meter
clean-out, stored in a spring-loaded holder at the right
rear of the air manifold. The container can hold all the
seed in the meter and inlet (up to a closed slide gate).
The container can be converted into a true funnel for
complete system clean-out.
The hoppers are connected to the rows with clamped
hose, and are not intended to be routinely unlatched
and tipped for clean-out.
Funnel Conversion
Materials and tools needed:
•
a length of 1
3
/
8
inch I.D. hose
•
a worm drive clamp with a working diameter of
approximately 1
3
/
8
to 2
1
/
4
inches
•
a hacksaw
b
with fine-toothed blade
Trim the sump from the funnel. Slide the hose fully
onto the funnel tip. Secure with clamp (do not
-over-tighten clamp, the funnel wall be crushed).
The choice of complete system clean-out process
depends on whether you are using the 817-811C as a
container or funnel.
a. The “FILL METER” function can divert all the air to seed delivery, but only does so for a short period of time (~90 seconds).
b. The funnel wall is thin ABS. Scissor-type pipe-cutting tools may fracture it. Rotary-type pipe cutting tools may slip off.
Figure 128
Y-Tube Shut-Off
29758
Figure 129
Convert Container to Funnel
29988
1
4
2
3
1
2
3
4
2
3