![GREAT PLAINS Nutri-Pro NP30A Operator'S Manual Download Page 87](http://html.mh-extra.com/html/great-plains/nutri-pro-np30a/nutri-pro-np30a_operators-manual_2259476087.webp)
NP30A or NP40A
Applicator Operating Instructions
83
2019-03-11
407-502M
Short-Term Parking
1. Conclude application per “
2. Unhitch nurse tank per “
3. Choose an applicator parking location with level firm
ground. Do not unhitch on a steep slope.
4. Recover emergency shutoff rope from tractor.
Store on applicator.
5. Fully raise applicator (page 50).
6. Fold applicator (page 59).
7. Depending on hitch type:
Engage center section and lift-assist transport locks
(page 45), and/or
swing down parking stands (page 36) and/or
install jack stand on tongue (page 30).
8. Lower fertilizer applicator onto locks/stands. On
pull-type, use parking jack to neutralize tongue
weight at tractor hitch.
9. Set hydraulic circuits to neutral.
10. Disconnect hydraulic lines. Secure them so that they
do not touch the ground.
11. Disconnect electrical cables, capping where
provisioned.
12. Disconnect any safety chain. Unhitch. Restart tractor
and pull away from fertilizer applicator.
Long-Term Storage
1. Conclude application per “
2. Unhitch nurse tank per “
3. Choose an applicator parking location with level firm
ground. Do not unhitch on a steep slope.
4. Recover emergency shutoff rope from tractor.
Store on applicator.
5. Fully raise applicator (page 50).
6. Clean fertilizer applicator of mud, dirt, excess oil and
grease.
7. Lubricate all points listed in Maintenance.
8. Apply grease to exposed cylinder rods to prevent
rust.
9. Inspect fertilizer applicator for worn or damaged
parts. Make repairs and service during off season.
10. Use spray paint to cover scratches, chips, and worn
areas on the fertilizer applicator to protect the metal.
11. Fold applicator.
12. Cover fertilizer applicator with a tarp if stored
outside.
Ending Application Checklist
Page
1
Suspend operations as at left, then…
2
Put on your goggles and gloves
-
3
Close nurse tank withdrawal valve
4
Re-enter cab. Turn MASTER switch ON
-
5
Resume field application.
Raise flow rate to maximum.
6
Continue application until both cooler and flow
divider pressures are zero.
-
7
Turn into wind.
-
8
Raise applicator and stop.
9
Set MASTER switch off.
-
10
Wait one minute.
-
11
Turn left (wind from right). Stop.
-
12
Open all bleed valves.
13
Close all line valves.
14
Wait one hour.