![GREAT PLAINS 2N-2410 Operator'S Manual Download Page 19](http://html1.mh-extra.com/html/great-plains/2n-2410/2n-2410_operators-manual_2259414019.webp)
8/2/18
196-126M
2N-2410 & 2N-3010
Drill Preparation and Setup
16
4.
Hitch the drill to the tractor using a hitch pin at least
one inch in diameter. Install a retaining clip on the
hitch pin to prevent it from working up.
A clevis-style hitch, Great Plains part number
196-136H, is available through your Great Plains
dealer.
When hitching the drill to a different tractor, check for
differences in drawbar heights and re-adjust the drill hitch
accordingly.
Installing Drill Control Consoles
1.
Mount the control boxes at a convenient location in
the tractor cab. Connect the 12-foot extension cable
to the pin connector on the back of the control box.
Route the cable to the tractor drawbar area. Secure
the cable to avoid damage.
2.
Connect the power cords to a 12-volt power source
on the tractor. The polarity of the power supply is
very important. The red wire must be connected to
the positive (
+
) battery terminal. The white wire must
be connected to the
negative (-) battery terminal.
To help with console and wire harness installation
refer to diagram on page 56.
Hitch Height Adjustment, 24-Foot Drills
Figure 4
16274
Hitch Height Adjustment, 30-Foot Drills
Figure 5
16532