Great Plains
| 118-949M | 2018-07-03
24
1525P and 1510HDP
Operating Instructions
Planting
and “
First Pass Operation Checklist
Page
1.
Set tractor 3-point hitch to “depth control”
operation (and not load control)
-
2.
Unfold marker on next-row side.
3.
Pull forward, lower drill, and begin planting
for a short distance.
4.
Stop. Assess:
•
planting depth
•
seed spacing
•
press wheel operation
•
fertilizer application (if in use)
5.
Make necessary adjustments
Sharp Field Turns Checklist
Page
1.
Fold marker
2.
Raise drill
-
3.
Make turn
-
4.
Lower drill
-
5.
Unfold marker on next-row side.
6.
Resume planting.
Suspending Planting Checklist
Page
1.
Stop tractor
-
2.
Fold Marker
3.
Raise drill
-
Ending Planting Checklist
Page
1.
Suspend operations as above, then
2.
Unload seed
3.
Lights ON
-
4.
Transport
Checking Planting Rate
Although the optional seed monitor can report useful full
pass results, cautious practice includes manually
checking the seed rate early in the first pass.
The Seed Rate Chart book for this drill (manual part
number 118-959B) contains sampling instructions.