background image

1

Fish & Chip Shop

L4700

easy 

- medium - hard

Assembly Difficulty

one-person job

A few important pointers before you start:
• 

Please read the instructions right through before you start, and check 
that all the components have been included in the pack; we find 
separating all the hardware into piles makes it easier to be sure that 
everything is present and correct.

• 

Make sure you have the right tools. Allen keys are provided if required, 
but screw drivers and other tools are not. You’ll find details of the tools 
you need at the beginning of the instructions.

• 

Do not throw away any packing materials until assembly is complete, 
just in case you accidentally discard smaller parts or hardware. 

Thank you for shopping with GLTC, we hope you enjoy 

having this product in your home.  
We know assembling furniture, toys or accessories is not everyone’s 
favourite way to spend their time, so we’ve tried to make assembling 
this item as quick and painless as possible. 

Hopefully our efforts will have been worthwhile and you’ll sail 
through the whole process. But if it all feels a bit too much 
like hard work, then we do have an assembly company we 
can recommend: the Flatpack Construction Company offers a 
nationwide service and can be contacted on 

0843  289  4951  or                                          

www.flatpackconstruction.co.uk.

16/01/2019

V2

Summary of Contents for Fish & Chip Shop L4700

Page 1: ...tions Do not throw away any packing materials until assembly is complete just in case you accidentally discard smaller parts or hardware Thank you for shopping with GLTC we hope you enjoy having this...

Page 2: ...to the European Toy Safety Directive DO NOT use this item if any structural components are missing or damaged Please retain these instructions for future reference Customer Service If you find that an...

Page 3: ...3 Component Check List A B Component Check List K C D E F G H I J L M N O P 1x 1x plain blue panel for step 5 1x 1x 1x 2x 1x 1x 1x 1x striped printed panel for step 8 1x 1x 1x 2x 18x 1x...

Page 4: ...4 Component Check List Q R Component Check List 1 2 You will need not supplied S 3 Philips Head Screwdriver U T 4x Screws 25mmL 11x Barrel Nuts 7mm dia 11x Barrel Nuts 40mmL 4x 2x 4x 2x 1x...

Page 5: ...2 x screws STEP 3 Attach the shelf H onto panel G using 2 x screws STEP 4 Screw part J into the back of panel G by hand ensuring that it is well tightened STEP 1 Slot together parts E and D 2x 1 Scre...

Page 6: ...A 2 3 Hardware for Step 5 1x 2 Barrel Nuts 1x 3 Bolts Hardware for Step 6 2x 2 Barrel Nuts 2x 3 Bolts 3 3 2 2 A C E D A C Hardware for Step 5 1x 2 Barrel Nuts 1x 3 Bolts 3 2 K Place assembled panels...

Page 7: ...nd panel I to the assembled section using 5 x barrel nuts and bolts ensuring that the dowels slot into the holes on the inside of panel I Hardware for Step 10 5x 2 Barrel Nuts 5x 3 Bolts I 3 3 3 3 3 2...

Reviews: