Concerto — Instruction Manual
135
Field Replaceable Units
Figure 79. Fan Replacement (7 RU frame shown)
Controller Modules
Swapping a MCS-MC-C2 with a MCS-MC-C2
The following procedures are used to swap a MCS-MC-C2 with a replace-
ment.
Encore Controlled Non-Redundant Systems
1.
Inspect the new Controller module.
2.
Set the DIP Switch bank S11 switch number 1 to
ON
. Switches 2 to 8 are
set to
OFF
.
3.
Remove the old Controller module.
4.
Insert and seat the new Controller module.
The
PWR OK
(power OK) and
DONE
LED will light signifying the module
is up and ready to receive commands. The next command sent from the
control system will cause the
ACT
(active) LED to turn on.
The next command sent from the control system will cause the
ACT
LED
to turn on. Continued commands prompt the
ACT
LED to flash.
5.
Send a switch command from the control system and verify that the
switch was executed.
8138_00_09r0
Fan Module
Finger hole
Summary of Contents for Concerto
Page 1: ...Concerto ROUTING MATRIX Instruction Manual Software Version 1 7 6 1 071813811 OCTOBER 2009 ...
Page 3: ...Concerto ROUTING MATRIX Instruction Manual Software Version 1 7 6 1 071813811 OCTOBER 2009 ...
Page 8: ...8 Concerto Instruction Manual Contents Glossary 159 Index 169 ...
Page 10: ...10 Concerto Instruction Manual Preface ...
Page 26: ...26 Concerto Instruction Manual Regulatory Notices ...
Page 102: ...102 Concerto Instruction Manual Section 2 Installation ...