Section 3 - Operation
3-16
80804002
3.7
CHECKS BEFORE REMOTE CONTROL OPERATION
This section outlines the checks to be performed at the beginning of each work shift
or at each change of operator. Repair any deficiencies before driving or operating
the equipment. During warm-up period, check the following:
• Ensure digging brakes and park brake function properly before moving
undercarriage in remote control.
• Be sure travel alarm and horn function properly. Both must be audible from the
cab with engine running.
• Check to ensure control pattern decal matches joystick controls.
• Make sure all boom and attachment functions operate smoothly and correctly.
• Forward and reverse travel, digging brakes, and steering operate correctly.
• Swing the upperstructure left and right and ensure the swing brake functions
properly.
• Make sure the engine does not start with the control cut out lever in the lowered
position.
• Check to ensure the engine functions properly and the lights and indicators
located in the upperstructure cab are functioning.
Summary of Contents for XL3100IV
Page 6: ...Read This First d 80804002 NOTES...
Page 24: ...Section 1 General Safety Practices 1 14 80804002 NOTES...
Page 33: ...Section 2 Pre Operation and Controls 2 9 80804002 NOTES...
Page 53: ...Section 2 Pre Operation and Controls 2 29 80804002 NOTES...
Page 61: ...Section 2 Pre Operation and Controls 2 37 80804002 NOTES...
Page 79: ...Section 3 Operation 3 9 80804002 NOTES...
Page 108: ...Section 3 Operation 3 38 80804002 This Page Intentionally Left Blank...
Page 152: ...Section 5 Lubrication Maintenance 5 38 80804002 NOTES...
Page 164: ...Section 7 Specifications 7 10 80804002 This Page Intentionally Left Blank...