
Prime
Prime
Prime Pump
Pump
Pump
1.
Ensure that the system has completed the heat
soak cycle. The display status bar should read
Active
Active
Active.
2.
Adjust the air motor air regulator (CK) to 0 psi.
3.
Ensure air motor solenoid valve (CN) is on. The
indicator light on the solenoid connector will only
be on if “Enable Pump Autostart” is selected on
the System 1 Setup screen.
4.
Adjust the air motor slider valve (CM) to the open
position.
5.
Adjust the air motor air regulator (CK) to
approximately 20 psi (138 kPa, 1.38 bar).
6.
Place a waste container under the bleed stem
(Z). Using an adjustable wrench, open the bleed
stem counterclockwise 1/3 -1/2 turn.
334130D
31
Summary of Contents for Therm-O-Flow 200
Page 48: ...Repair Figure 28 48 334130D...
Page 56: ...Repair Figure 34 Inside of Electrical Control Enclosure 56 334130D...
Page 59: ...Electrical Schematics 400V 400V 400V 3 3 3 Phase 50 Phase 50 Phase 50 Hz Hz Hz 334130D 59...
Page 61: ...Electrical Schematics AWB AWB AWB and and and MZLP 1 MZLP 1 MZLP 1 334130D 61...
Page 63: ...Electrical Schematics MZLP MZLP MZLP Zones Zones Zones 334130D 63...
Page 67: ...Parts Electrical Electrical Electrical Module Module Module 334130D 67...
Page 68: ...Parts 68 334130D...