Calibration
Calibration
Calibration Screens
Screens
Screens
Calibrate
Calibrate
Calibrate Screen
Screen
Screen 1
1
1
Calibrate Screen 1 initiates a pump pressure check
(stall test) for the selected pump. During the test, the
Stall Test screen will appear.
The pump and lines must be primed with color
or catalyst before doing the stall test. See
, to set test parameters.
See
for complete
test instructions.
To initiate the test, press the Pressure Check
button for the desired pump. The system will first
check the inlet pressure due to the material supply
pressure. If this pressure is greater than 90% of
the Stall Test Pressure, the system will generate an
alarm and halt the stall test. The pump will build
pressure in the line to a minimum of the Stall Test
Pressure. The pump will then move to the center
stroke position and stall test the upstroke, followed
by the downstroke.
NOTE:
NOTE:
NOTE: The Last Passed log can only be reset by
successfully completing the test.
The screen displays the number of days since the
last stall test was passed for each pump.
Figure 67 Calibrate Screen 1
Figure 68 Stall Test Screen
Calibrate
Calibrate
Calibrate Screen
Screen
Screen 2
2
2
Calibrate Screen 2 initiates a volume test for the
selected pump. During the test, the Volume Check
screen will appear.
The pump and lines must be primed with color
or catalyst before doing the Volume Check. See
for complete test
instructions.
To initiate the test, press the Volume Check
button for the desired pump.
The screen displays the volume dispensed. Press
to end the test.
Press and hold the Reset button
for 1-2
seconds to reset the volume counter.
Figure 69 Calibrate Screen 2
Figure 70 Volume Check Screen
88
3A4486D