
Maintenance
309403R
11
Maintenance
Preventive Maintenance
Schedule
The following schedule is only a general guideline.
Therefore, you must establish your own preventive
maintenance schedule based on the operating condi-
tions and application of your specific system. These cri-
teria will determine how often maintenance, repair, and
rebuild is needed.
Establish a preventive maintenance schedule by record-
ing when and what kind of maintenance is needed.
Then determine a regular schedule for checking your
system.
Repair technicians must conform to the prescribed
maintenance intervals to prevent malfunctions and
unscheduled production interruptions.
For components or procedures that are not listed in this
table, contact your Graco distributor.
Table 1. General Guidelines for a Preventive Maintenance Schedule
*Service life is dependent upon on production load factors and material characteristics.
***Preventive maintenance schedule for the bellows seal is dependent on material and application parameters. More
frequent changes may be required for difficult materials.
Suggested
Schedule
Component Description
Refer to:
Daily
Clean the nozzle and deflector.
309403
Inspect the lower housing on the applicator, especially behind the deflector.
Remove the material from behind the deflector to prevent any fluid seepage into the
orbiter coupler tube bearing.
Daily
Inspect bellows seal for damage.
309403
Daily
Clean bellows seal.
309403
Weekly
Inspect cables and hoses.
309403
Weekly
Inspect the dispense valve for signs of leakage.
308876 and
309376
Monthly
Change bellows seal***.
309403
3-6 months*
Service the dispense valve.
308876 and
309376
Determined
by customer
application
Rebuild the PrecisionSwirl applicator.
309403