Operation
34
334135B
Shutdown
If the machine is to remain idle for an extended period of
time, perform the following steps.
1.
If installed, remove static mixer from the end of the
dispense valve.
2.
Place a container below the dispense valve and
activate a small shot to flush mixed material out of
the valve.
3.
Relieve pressure. See
,
page 33.
4.
With a clean rag and cotton swabs, clean the end of
the dispense valve.
5.
Install the nightcap on the dispense valve. Refer to
MD2 Valve, Instructions manual for part information.
Summary of Contents for PR70e
Page 9: ...Component Identification 334135B 9...
Page 12: ...Recommended Parts 12 334135B Mixers 1301 1303 1302 Assembly LC0061 Shown ti12442a...
Page 19: ...Recommended Parts 334135B 19...
Page 56: ...Schematics 56 334135B Schematics Electrical Schematics FIG 21 Electrical Schematic...
Page 57: ...Schematics 334135B 57 FIG 22 Electrical Schematic...
Page 59: ...Schematics 334135B 59...
Page 67: ...Dimensions 334135B 67 Dimensions 25 1 in 65 cm 27 9 in 71 cm 9 0 in 23 cm 15 5 in 40 cm...
Page 68: ...Dimensions 68 334135B...