Replace
Replace
Replace HCM
HCM
HCM
1. Follow
Before Beginning Repair, page 52
2. Open the electrical enclosure and disconnect
all cables from the HCM (603).
3. Remove the nuts (610) and HCM (603).
4. Set rotary switch.
Figure 12 Replace HCM
HCM
HCM
HCM Rotary
Rotary
Rotary Switch
Switch
Switch Positions
Positions
Positions
0 = Reactor 2, H-30
1 = Reactor 2, H-40
2 = Reactor 2, H-50
3 = Reactor 2, H-XP2
4 = Reactor 2, H-XP3
Replace
Replace
Replace ADM
ADM
ADM
1. Loosen four screws (142) on the inside of
the electrical enclosure door. Lift up and
pull out to remove ADM (140).
2. Disconnect CAN cable (622).
3. Inspect ADM (140) for damage. Replace if
necessary.
4. Update software by installing an upgrade
token into ADM and cycling system power.
Wait until the update is complete before
removing the token and restarting the
system.
Figure 13
Software
Software
Software Update
Update
Update Procedure
Procedure
Procedure
NOTICE
NOTICE
NOTICE
Repair kit GCA modules are shipped
pre-programmed and with upgrade token
(part number 17E206). If software version
upgrade is necessary, follow the procedure in
the manual provided.
334946J
73