Startup
18
334530D
Startup
1.
Perform
Pressure Relief Procedure
,
page 13.
2.
Turn pressure control to lowest
pressure.
3.
Turn ON/OFF switch to
ON
position.
4.
Place fluid intake in paint pail. Place
drain tube in waste pail.
5.
Turn pressure control to Fast Flush to
start motor. Allow paint to circulate
through drain tube for 15 seconds.
6.
Turn prime valve horizontal. Disengage
trigger lock.
7.
Hold gun against grounded metal waste
pail. Trigger gun until paint appears.
ti24953a
ti24644a
ti24954a
15 s
ti24646a
ti24647a
1 m