Before You Start
3A5082G
5
Before You Start
Grease Fittings
a.
Lubricate all grease fittings using a grease gun
and verify that every grease point is accepting
grease.
b.
Use a clean cloth or rag to remove any
remaining grease, contaminants or dirt from the
area around the passage way to the grease
points.
c.
Remove grease fittings and extensions and
install appropriate feed line fitting.
System Overview
The Electric Grease Jockey Automatic Lubrication
System includes the following components. Numbers
and letters used in these instructions refer to the Typical
System Installation, page 6, and the component pages
listed below.
•
Electric Grease Jockey Pump, page 8
•
Illuminated Remote Run Button, page 16
•
Direct Mount Vent Valve, page 17
•
Manifold, page 42
•
Injectors, page 44
•
Lubrication Modules, page 47
•
Feed Line Tubes and Fittings, page 54
•
Main Line Hose, page 56
Pressure Relief Procedure
Follow the Pressure Relief Procedure whenever
you see this symbol.
Relieve pressure
in system using two wrenches
working in opposite directions on the banjo bolt (A) and
outlet fitting to
slowly loosen fitting only
until fitting is
loose and no more lubricant or air is leaking from fitting.
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury from
pressurized fluid, such as skin injection, splashing
fluid and moving parts, follow the Pressure Relief
Procedure when you stop dispensing and before
cleaning, checking, or servicing the equipment.
F
IG
. 1
A
outlet
fitting