42
Repeat the process with machine on the right side of the frame.
4
Task 9 - Leveling the Frame (continued)
Repeat the process again, putting the machine a few inches to both sides of the middle leg. If
the machine begins to roll toward either side of the frame, raise the feet on that side.
5
Queen Assembly Part Three
Summary of Contents for Q-Zone Queen
Page 1: ...Assembly Instructions Copyright December 3 2021 V2 0 Grace Company ...
Page 2: ......
Page 13: ...13 Queen Assembly ...
Page 44: ...44 Crib Assembly ...
Page 72: ...72 Repeat the process with machine on the right side of the frame 4 Crib Assembly Part Three ...
Page 84: ...The Grace Company Phone 1 800 264 0644 www graceframe com ...