www.globalplasmasolutions.com
Installation, Operation & Maintenance Manual
GPS-FC3T-BAS
™
Page 1: ...www globalplasmasolutions com Installation Operation Maintenance Manual GPS FC3T BAS ...
Page 2: ...E INSTALLATION MECHANICAL INSTALLATION 1 Select a location for installation The GPS FC 3T BAS needs to be perpendicular to the air flow air should flow past needles like a ball through the goal posts The GPS FC 3T BAS should be mounted so that the nee dles are exposed to airstream The ideal location on typical split systems is on the blower housing the side opposite the blower motor The housing of...
Page 3: ...tape Route the wires so that they will not short abrade or damage other components If not already done connect the GPS FC 3T BAS to the low voltage side of AVP 12 24 red and black wires red to red and black to black Connect the neutral leg of power to the blue wire Connect the line or power leg to the brown wire Connect the orange wires to the Building Automation System wires or terminals if prese...
Page 4: ...asolutions com 3101 Yorkmont Road Suite 400 Charlotte NC 28208 980 279 5622 GPS GPS FC 3T BAS and its logos are trademarks of Global Plasma Solutions Inc 2020 Global Plasma Solutions Inc 030120 GPSFC 3T BAS IOM REV A ...