1
1.
Shims or wedges
Figure 13: Top view
1
1.
Shims or wedges
Figure 14: Side view
3.
Lower the baseplate carefully onto the foundation bolts.
4.
Put the machinist's levels across the mounting pads of the driver and the mounting pads of the
pump.
NOTICE:
Remove all dirt from the mounting pads in order to ensure that the correct leveling is achieved.
Failure to do so can result in equipment damage or decreased performance.
5.
Level the baseplate both lengthwise and across by adding or removing shims or moving the wedg-
es.
These are the leveling tolerances:
•
A maximum difference of 3.2 mm | 0.125 in. lengthwise
•
A maximum difference of 1.5 mm | 0.059 in. across
You can use the baseplate-leveling worksheet when you take the readings.
6.
Hand-tighten the nuts for the foundation.
4.2.3 Install the baseplate using jackscrews
Tools required:
•
Anti-seize compound
•
Jackscrews
•
Bar stock
•
Two machinist's levels
•
Baseplate-leveling worksheet
This procedure is applicable to the feature-fabricated steel baseplate and the advantage base baseplate.
1.
Apply an anti-seize compound on the jackscrews.
The compound makes it easier to remove the screws after you grout.
2.
Lower the baseplate carefully onto the foundation bolts and perform these steps:
4.2 Baseplate-mounting procedures
26
XHD Installation, Operation, and Maintenance Manual
Summary of Contents for XHD
Page 1: ...Installation Operation and Maintenance Manual XHD ...
Page 2: ......