5.13 Reset the i-ALERT
®
3 Health Monitor
To deactivate or reset the i-ALERT
®
3 monitor, please refer to the i-ALERT3
®
Always reset the health monitor when the pump is started after maintenance, system change, or being
shut down for an extended period of time. Failure to do so may result in false baseline levels that could
cause the health monitor to alert in error.
5.14 Make the final alignment of the pump and driver
WARNING:
•
Failure to disconnect and lock out driver power may result in serious physical injury or
death. Always disconnect and lock out power to the driver before performing any installa-
tion or maintenance tasks.
•
Electrical connections must be made by certified electricians in compliance with all
international, national, state, and local rules.
•
Refer to driver/coupling/gear manufacturer's installation and operation manuals
(IOM) for specific instructions and recommendations.
•
Misalignment can cause decreased performance, equipment damage, and even cata-
strophic failure of frame-mounted units leading to serious injury. Proper alignment is the
responsibility of the installer and the user of the unit. Check the alignment of all drive
components prior to operating the unit.
•
Follow the coupling installation and operation procedures from the coupling manu-
facturer.
You must check the final alignment after the pump and driver are at operating temperature. For initial
alignment instructions, see the Installation chapter.
1.
Run the unit under actual operating conditions for enough time to bring the pump, driver, and asso-
ciated system to operating temperature.
2.
Shut down the pump and the driver.
3.
Remove the coupling guard.
Refer to
5.2 Remove the coupling guard on page 43
.
4.
Check the alignment while the unit is still hot.
Refer to
4.4 Pump-to-driver alignment on page 28
in the Installation chapter.
5.
Reinstall the coupling guard .
6.
Restart the pump and driver.
5.15 Dowel the pump casing
You will need the following tools:
•
Two number 7 taper pins
•
One number 7 taper pin reamer
•
0.3320 in. or "Q" size drill
•
Hardwood block or soft-faced hammer
Also make sure that the final alignment is complete.
Dowel the pump casing to the baseplate pedestals in order to make sure that you maintain the proper
pump position.
1.
Drill two holes, one in each casing mounting pad, at the locations provided.
5.13 Reset the i-ALERT®3 Health Monitor
Model 3700i API610 / Type OH2 Installation, Operation, and Maintenance Manual
65