Safety
Page 12
Danger of high voltage
When installing and electrically connecting the device, make sure the activities are performed by qualified
personnel.
Switch off the electrical power supply before performing activities to the device!
Danger – Risk of an electric shock!
Always use the main power switch (on the control box) to switch off the installation in the event of a
dangerous situation.
Do not restore power until the dangerous situation has been resolved!
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO) is an internationally agreed safety procedure to make sure that dangerous
machines are properly shut off, and that they will not be able to be started up again prior to the
completion of maintenance or repair work.
The main switch has two holes in the housing in the OFF-position, it is prepared for LOTO.
LOTO has to be done for every maintenance- or repair activity to the Non-Ferrous separator.
In that way activities can be performed to the device, without any risk for personal injuries.
!