Step 26: Level Swing Beam
1: Place a level on top of the swing beam and adjust the beam legs in or out as needed
to make the swing beam level.
Important note: the legs are designed to accommodate swing beams on uneven ground
(down slope). They are longer than required. If your ground is relatively level, you may
need to either a) shorten the end of the legs; b) dig in both legs where they meet the
ground, or c) bend the legs out slightly to match your grade.
Page 58
®