12
2.5.
Sealing inspection
Open the pressure-reducing valve or natural gas valve and control by
application of much foamy water on the connection to find out any gas
leakage.
Never control by flame.
2.6.
Final inspection
1.
Plug the power cable into the socket and activate the fuse of the
equipment.
2.
Control the functions.
2.6.1.
LPG-NG / NG-LPG conversion
Figure 12
Figure 12.1
Figure 12.2
Figure 12.3
Figure 12.4
Remove the burner cover and burner as shown in in the Figure
12.
Remove the injector by help of 7’s socket screwdriver as
shown in the Figure 12.1
Fix the injector (D) to be converted as shown in the Figure
12.2.
(see table 1).
Replace the burner as shown in the Figure 12.3.
Turn on the burners respectively after conversion and
remove the button on the control panel and set the flame
length by tightening or loosening the screw on the gas
valve (12.4 cock) or in the valve shaft
.
Summary of Contents for GT641KB
Page 1: ...GT641KB GTW641KB ...
Page 20: ...19 EN 2021 738872 738867 VER 0 2021 ...
Page 21: ...GT641KB GTW641KB Priročnik za uporabo Navodilo za namestitev Navodila za predelavo ...
Page 41: ...GT641KB GTW641KB Korisnički vodič Uputa za montažu Uputstvo za pretvaranje ...
Page 81: ...Пайдаланушы нұсқаулығы Орнату нұсқауы Өзгерту нұсқауы GT641KB GTW641KB ...
Page 100: ...GT641KB GTW641KB Посібник користувача Інструкція по установці Інструкція з перетворення ...
Page 119: ...738872 738867 VER 0 2021 UA 2021 ...
Page 120: ...KK 19 738872 738867 VER 0 2021 KK 2021 ...
Page 141: ...GT641KB GTW641KB Kasutusjuhend Paigaldusjuhend Ümberehitamisjuhised ET ...
Page 161: ...1 GT641KB GTW641KB Naudojimo instrukcija Montavimo instrukcija Keitimo instrukcija LT ...
Page 181: ...GT641KB GTW641KB Lietotāja rokasgrāmata Uzstādīšanas norādījumi Pārveides norādījumi LV ...
Page 201: ...GT641KB GTW641KB Manual de întrebuințare Instrucțiuni de montaj Instrucțiuni pentru reciclare ...