background image

GVC-72000

Vapor-Steam Cleaner

Operating and Maintenance 

Instructions

Operating and  

Maintenance  

Instructions

Read before operating.

Summary of Contents for GVC-72000

Page 1: ...GVC 72000 Vapor Steam Cleaner Operating and Maintenance Instructions Operating and Maintenance Instructions Read before operating ...

Page 2: ...ith all Goodway products you can be assured that the finest quality components and workmanship have gone into this machine Please take a few minutes to read the following Operating and Maintenance Instructions By carefully following the instructions you will obtain years of trouble free service from this product Please pay particular attention to the safety instructions and exercise caution when u...

Page 3: ... tank is clean Avoid the use of buckets or canisters to fill the tank unless these are completely free of dirt or foreign objects 6 Do not drag the machine by pulling the hose this can damage the hose 7 Do not unplug by pulling on cord To unplug grasp the plug not the cord 8 Check the power supply cable before use for any damage In the event of damage to the power supply cable have it immediately ...

Page 4: ...ay from openings and moving parts 23 Do not operate unit when fatigued or under the influence of drugs or alcohol 24 Do not over reach or stand on unstable support Keep good footing and balance at all times 25 Stay alert and watch what you re doing 26 Both front casters must be locked when unit is plugged into power supply GROUNDING INSTRUCTIONS This vapor steam cleaner must be grounded If it shou...

Page 5: ... 3 Emergency Off Button 4 Functions Control Panel 5 Boiler Control Panel See Pic 2 on next page 6 Pressure Gauge A 1 7 Pressure Gauge A 2 8 Power On Off 9 72kW Hose Connection Manifold 10 Boiler Steam Drain Valve On Off GENERAL FEATURES Front Panel Pic 1 1 2 3 8 4 9 7 6 10 5 ...

Page 6: ...4 Boiler Heating LED 5 5 Boiler On Off Switch 5 6 P1 Service Function 5 7 Temperature Display 5 8 P2 Service Function Functions Control Panel Pic 3 4 1 Tank Full LED 4 2 Continuous Water Fill On Off 4 3 Boiler Selector 36kW 72kW 4 4 Steam Output Selector 4 4 4 3 4 2 4 1 5 2 5 3 5 3 5 8 5 7 5 6 5 1 5 5 ...

Page 7: ...es to Goodway Technologies Corporation s Customer Service at 800 370 2855 2 Attach handle to the front of the unit using four included fasteners 3 Position this vapor steam cleaner in the area it will be used 4 Connect the unit to the plant s wiring See nameplate for power requirements It is imperative that the ground connection is properly made See grounding instructions for more information 5 Co...

Page 8: ... the hose into the hose connection socket 1 2 or 9 Pic 1 depending on the application ensuring that it is securely fitted 7 Fasten accessories to lances by firmly pushing them on to the tip nozzle 3 3 Pic 3 8 Pull the trigger 3 1 Pic 3 on the hand grip to start the steam output and direct the steam jet towards the area to be cleaned 9 Control steam output by selecting the two hose output A A or si...

Page 9: ...o the ON position using the k eys provided If you are not already doing so put on heat protection gloves and safety glasses Remove the cap from the top ball valve in the back of the steamer labeled Boiler Steam Drain Valve Then slowly open the ball valve Wait until both pressure gauges read 6 BAR 5 Turn off the main power 8 Pic 1 Now wait 30 seconds 6 Turn the machine back on 8 Pic 1 Turn the boil...

Page 10: ... because such water contains no minerals and carbonates and could lead to malfunction DANGER If any maintenance is going to be done ALL PRESSURE must be bled from the boilers before starting any work See page 9 for instructions on bleeding the boiler DANGER Wear protective clothing gloves and glasses while operating the below procedure the hot water can cause injuries DANGER Remove electrical powe...

Page 11: ... TECHNICAL INFORMATION Specifications Input Power 86 amps 480 V 60 Hz AC three phase Maximum 72 000 W Power Supply Cord 2 4 Output Steam Temperature 290 F Max Steam Output 7 GAL HR dry 9 5 GAL HR wet Boilers Eight 2 4 gallons stainless steel Heat Up Time 5 min Water Tank 10 6 gallons stainless steel Dimensions 40 high x 24 wide x 40 deep Weight 370 lbs net dry Continuous Feeding Inlet YES GH Conne...

Page 12: ...skets clean and place a light film of silicone grease on the gasket Hose plug hard to insert in the machine socket Lubricate the steam socket connection with some silicone No steam output but the machine is in pressure Make sure the manual output valve is open Machine heating time too long Remove scale from boiler as described in the maintenance section The pressure drops rapidly during operation ...

Page 13: ...GVC 72000 13 NOTES ...

Page 14: ...55 GOODWAY TECHNOLOGIES CORPORATION 420 West Avenue Stamford CT 06902 USA Tel 203 359 4708 Toll Free Tel 800 243 7932 Fax 203 359 9601 Toll Free Fax 800 359 9625 Email goodway goodway com Visit www goodway com P N NEW Copyright 2018 Goodway Technologies Corp Stamford CT USA Effective date September 13 2018 Goodway is a Trademark of Crossford International Goodway reserves the right to improve prod...

Reviews: