background image

System  Tested  and  Certified  by  NSF  International  against 

NSF/ANSI Standard 58 for the reduction of the claims speci-

fied on the Performance Data Sheet (Page 3)

Please read this manual carefully 

before attempting installation.

(1)

Good Water Warehouse Inc.

1700 E Walnut Ave 

Fullerton CA 92831

(714) 441-2893

(714) 441-0525 FAX

System Conforms to NSF/ANSI Standard 58 

for Performance Class 

System Tested and Certified by NSF International against NSF/ANSI Standard 58 for the 

reduction of the claims specified on the Performance Data Sheet (page 3)

Model # GOLDLINE-50

Reverse Osmosis System

Installation & Service Guide

Summary of Contents for GOLDLINE-50

Page 1: ...tempting installation 1 Good Water Warehouse Inc 1700 E Walnut Ave Fullerton CA 92831 714 441 2893 714 441 0525 FAX System Conforms to NSF ANSI Standard 58 for Performance Class System Tested and Certified by NSF International against NSF ANSI Standard 58 for the reduction of the claims specified on the Performance Data Sheet page 3 Model GOLDLINE 50 Reverse Osmosis System Installation Service Gui...

Page 2: ...ntain filterable cysts The Goldline RO System conforms to NSF ANSI Standards 58 for performance claims as verified and sustained by test data All pre and post filtration demands were removed prior to contaminant reduction performance testing by the Water Quality Association laboratory Necessary Installation Tools Variable speed drill Teflon tape Relton Drill Small knife 1 hole saw Phillips screw d...

Page 3: ...g or both under standard test conditions Test parameters 25º 1ºC 50 psi and pH of 7 5 13 Chlorine in the influent water may affect the RO membrane polymers General installation Operation Maintenance Requirements Recommended Replacement of Membrane and Filters R O Membrane 1204694 2 to 5 years Sediment Prefilter 1227867 V 6 months Carbon Block Prefilter 32 250 125 975 6 months Carbon Block Prefilte...

Page 4: ... water feed line you choose to use for the supply Accidentally hooking up the system to the hot supply line will permanently damage the membrane See Conditions for operation To assure you are using the cold water line turn on both the hot and cold faucet After the water is warm to the touch feel the pipes under the sink It will be easy to identify the hot and cold pipes Close the cold water valve ...

Page 5: ...ly on both sides Avoid overtightening RO Membrane Installation Disconnect the easy fitting as shown in the diagram below Remove the membrane housing head by turning counter clockwise Using the opening in the drain outlet saddle as a guide drill a 1 4 hole in the drain pipe Clean debris from the saddle and threads Mounting the Tank Ball Valve 1 Wrap the threads on the top of the water storage tank ...

Page 6: ...motor to apply light pressure to the porcelain surface Start the drill motor turning as slowly as possible After the initial cut has started motor speed may be gradually increased The cut may require three to four minutes to complete Going faster could result in excessive chipping This saw is used to cut the porcelain only Be sure a complete ring has been cut through the porcelain to the metal und...

Page 7: ...low restrictor to Airgap faucet 1 4 Black tubing from feed Stage 1 Sediment Prefilter Stage 3 Carbon Block Stage 2 Carbon Block Stage 5 Carbon Postfilter Stage 4 TFC Membrane Storage Tank 3 8 White tubing to tank Drain Connector Cold water feed supply TDS Monitor optional Color Coded Tubing TUBING DIRECTIONS 1 4 Black Feed water supply line to inlet on sediment filter elbow labeled feed 3 8 Blue C...

Page 8: ...er Warehouse For Parts Replacement BLACK WHITE ORANGE BLACK WHITE 24 25 14 1 4 WHITE 10 1 Supply Feed 3095 8 2 1 4 Male Connector CI010822W 3 Filter Housing 1H4WHWH 4 Filter Housing O Ring 143026 5 5 Micron Filter 1227867 V 6 Carbon Block 32 250 125 975 7 Carbon Block 32 250 125 975 8 1 4 Nipple N 14 9 1 4 Male Elbow CI480822W 10 Check Valve SCV CI480821W 11 Bracket A FM60W 12 ASO Valve FC ASV4000...

Page 9: ...ded to sanitize your system once per year when you are changing the filters Start by shutting off the cold water supply and draining the storage tank by turning on the RO faucet Once this is completed remove the filters and membrane and put 1 2 teaspoon of household bleach in the sediment filter housing Then run water through the system until water begins pouring out the RO faucet Close the faucet...

Page 10: ... Warehouse shall not be liable for consequential damages of any kind or nature due to the use of Goldline 50 product Good Water Warehouse Inc will provide warranty service under the following conditions 1 Contact your local dealer who will obtain return authorization instructions 2 Ship the unit or part freight prepaid for warranty evaluation or service Unit must be returned in the original carton...

Reviews: