19
Note: Before proceeding to the following steps, please revisit
steps with asterisks and use a wrench to tighten all hardware
that was originally hand tightened. Failure to tighten all
hardware as described can cause damage to the Tornado Boat
Lift and/or serious injury/death.
MOUNT ALUMINUM MULTI-BUNK
-15K CAPACITY LIFT
1.
Align the 3/4” hole in the Aluminum Multi
-Bunk with the
corresponding mounting hole in the top of the Stern Side H-
Frame.
2.
Insert one (1) 1/8” Cotter Pin into one end of a 3/4" Hinge Pin.
Using Pliers, bend the tines apart and away from each other,
securing it to the hinge pin.
3.
Attach a 3/4" Flat Washer over the Hinge Pin and insert it
into the bunk support as shown in Figure 19-A.
Note: Do not fully insert Hinge Pin through H-Frame until
completing next step.
4.
Insert a Lollipop Washer between the Bunk and the H-
Frame on both sides as shown in Figure 15 before fully
inserting the Hinge Pin through the H-Frame and out of the
opposite side of the Bunk.
5.
Attach a 3/4" Flat Washer and 1/8” Cotter Pin to the
protruding end of the Hinge Pin. Using Pliers, bend the tines
apart and away from each other, securing it to the hinge pin.
6.
Repeat this step three (3) more times, once for the opposite
end of the Bunk, and twice for the second Bunk.
MOUNT ALUMINUM MULTI-BUNK
-18K CAPACITY LIFT
1.
Align the 3/8” holes in the Aluminum Multi
-Bunk with the
corresponding mounting holes on the V-Bunk Brackets.
2.
Insert one (1) 3/8” Flat Washer over two (2) 3/8” Hex Bolts
and insert them into the holes on the Bunk as shown in
Figure 19-B.
3.
Attach one (1) 3/8" Lock Nut and one (1) 3/8” Hex Nut to the
protruding ends of the Hex Bolts and tighten with
appropriate wrench.
4.
Repeat these steps seven (7) more times, once for the other
side of the Bunk, and six more times for the other Bunks.
PARTS REQUIRED TO MOUNT ALUMINUM
MULTI-BUNK
Aluminum Multi-Bunk (4)
3/8” Lock Washer
(16)
3/8” Flat Washer (32)
3/8” x 5” Hex Bolt (16)
3/8” Hex Nut (16)
Figure 19-B
Figure 19-A