41
©Godiva Ltd. Our policy is one of continuous development. We therefore reserve the
right to amend specifications without notice or obligation.
MAINTENANCE SCHEDULE PC2_/PC1_
Note: The Godiva Compressor service intervals replace those in the Gardner
Denver Compressor manuals
EQUIPMENT
ACTION
PROCEDURE
EVERY 3 MONTHS
PC1_/PC2_
Check the pump and gearbox oil levels
Pages 24-26
Do a vacuum test to test for leaks
Page 44
PC1_/PC2_
Grease the CAFS mixing manifold ball valve with
waterproof grease
Page 43
PC2_
Clean the high pressure filter
Page 42
Compressor
Check the oil level and top up if necessary.
Run compressor for 15 minutes
Page 24-25
Check the drive belt tension and condition.
Page 28-29
FoamLogix
2.1A/3.3/5.0
Check that foam pipe connections are tight
See FoamLogix
manual
Operate the system in bypass to move the concentrate
and prevent gelling (if concentrate is left in the system
without use
for three months)
See FoamLogix
manual
EVERY 12 MONTHS
PC1_/ PC2_
Change the pump bearing housing oil
Maintenance
Manual
Compressor
Change the air filter
Maintenance
Manual
Change the oil and oil filter
Maintenance
Manual
Gearbox
Change the gearbox oil
Maintenance
Manual
FoamLogix
2.1A/3.3/5.0
Inspect wiring/connections, hoses/connections
FoamLogix
manual
Clean the foam strainer
FoamLogix
manual
Verify water flow calibration
FoamLogix
manual
Verify foam feedback calibration
FoamLogix
manual
EVERY 24 MONTHS
PC1_ /PC2_
Replace the primer seals
Maintenance
Manual
Replace the priming valve seals and diaphragm
Maintenance
Manual
Test the thermal relief valve
Page 44
Compressor
Replace the oil separator element
Maintenance
Manual